Skip to main content

Search the Special Collections and Archives Portal

upr000097 6

Image

File
Download upr000097-006.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000097-006
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    COPT JI « » Angeles - Uovember 19, 1953 1-733^ MSHOt Mr. Reinhardts Referring to your letter to Mr. Sanson, November 12, 1953, relative to proposed construction of new water tank at las Togas lnci- dent to transferring water appropriation from water field to shop well, Xn conversation with Division Engineer's office today, 1 was informed that the awarding of contract for erection of this tank is being handled by Mr. W, C. Perkins with a firm la Kansas City. Some time ago Mr. Perkins had Division Engineer make some soil tests at site where tank la to be erected. Data was furnished to Mr. Perkins so foundation for tank could be designed. Division Engineer has not yet been furnished data and prints so foundation can be constructed by Division forces nor does Division have any information as to award of contract for tank erection whi eh would indicate when construction is to be started or completed. In the meantime, water service forces are laying pipe lines and doing what they can under the work order, and state this part of the work will bo completed by the time the tank is erected. L. 6, Conner