Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 square on Exhibit "A" near point R. Section 17. In the event the District shall not have commenced to construct the new pipe lines and have removed the said existing pipe lines and pumping station as provided in Section 16 hereof within two years from the sale date and shall not have completed said work within two (2) years and ten (10) months subsequent to the sale date, Railroad Companies, after having given the District sixty (60) days' notice in writing of its intention so to do, shall have the right (a) to construct an adequate pipe line of a capacity equal to or exceeding that of the existing 24-inch cast iron pipe line and 16-inch transite and cast iron pipe line shown on said Exhibit "A" by broken black and red lines and of a type and size to be mutually agreed upon; and in the event the parties cannot agree upon the character of said proposed pipe line within ninety (90) days after said written notice, the same shall be constructed by Railroad Companies of 39-inch concrete or pipe of a similar character. Said proposed pipe line shall be constructed in the location shown in broken red and white line between points marked A and V and V and K on said Exhibit "A". (b) To construct a 24-inch pipe in the location shown in broken red and white line between points marked K and E on Exhibit "A" and an 8-inch pipe line in location shown in broken red and white lines between points marked Y and D on Exhibit "AM, it being understood that unless the 3 5 .