Skip to main content

Search the Special Collections and Archives Portal

upr000337 55

Image

File
Download upr000337-055.tif (image/tiff; 26.16 MB)

Information

Digital ID

upr000337-055
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

Los Angelos, starch 26, 1925 20-6 Mr. F* H® Knickerbocker, Referring to foot mallgram £-663 March 24 and my le t t e r Merab 11 regarding proposed se ttlin g basin and renewal o f pipe lin es at Las 7egas, The work as proposed by 1925 Budget Item Ho» 98 involves a portion o f the work now authorized by Work Order 4707. (The 1816* o f 24" wood stave pipe is intended to convey water from the se ttlin g basin to end of present 16" wood stave pipe lin o , while Work Order 4707 provides fo r making this connec­tion with 16" wood stave pipe* Zn toy ipinion i t I© essen tial to in s ta ll the la rg e r pipe at the upper end in order to reduce losses in pressure due to fric tio n and thus Increase capacity and pressure at the outlet end* Work Order 4707 was authorized on the basis o f accounting fo r the renewal o f a portion o f the pipe lin e as property Retired and Replaced, which in my opinion, Is incorrect as the portion o f the pipe lin e to h© renewed con­s is ts o f a minor portion o f the lin e , and the work should be handled on a Better­ment basis* A lso, due to the fa c t that the Budget Item and existin g authority overlap, it is ay recommendation that work Order 4707 be closed out on the basis o f charging only the now w e ll and fence around Big Bpring, replacing the buildings and pipe lin es from Springs A and B and concrete forebay* The to ta l expenditures to date against W*0* 4707 amount to |6,?34 o f which $1,355 is Capital Account and #4,605 Operating Expenses, taking Into consideration re tire ­ments above mentioned* fhe fence around spring has not boon b u ilt and is estimated to cost |500 chargeable to Capital Account, making the to ta l charge to M B $2,055 while #5,740 was appropriated by W*0* 4787*