Skip to main content

Search the Special Collections and Archives Portal

upr000120 259

Image

File
Download upr000120-259.tif (image/tiff; 26.87 MB)

Information

Digital ID

upr000120-259
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    IAS VEGa S LAM) AND WATER COMPANY RESOLUTION Western Auto Supply 717 On notion duly seconded, it was RESOLVED, that the action of President Salley end Assistant Secretary I tow in executing agreement bearing C. L. D. I55X0, entered into June 23, 1966 between Las Vegas Land and Water Company and The Ted H* Cooper Co*, Inc*, a California corporation, covering the preparation of plans and specifications and to con­struct in City of Industry, California a single story concrete tilt-up warehouse and office building, containing a floor area of approximately 300,000 square feet, and to furnish all material, labor and other things requisite and necessary therefor, consid­eration to be actual net cost plus ten per cent (10%), but not to exceed $1,423,604.00; work to commence July 1, 1966 and be com­pleted no later than January 31, 1967; contractor to furnish bond in the sum of $1,500,000*00; work to be under supervision of con­tractor to satisfaction of Land Company Engineer; payments to be made during progress of the work, less e reserve fund of ten per cent (10%), such reserve fund to be paid upon completion and ac­ceptance; contractor to procure and keep in effect during the life of this agreement, workmen's coraponsation and employer's liability insurance, contractor's public liability and property damage insur­ance, and contractor's contractual liability and property damage insurance; contractor for a period of 365 days after completion of