Skip to main content

Search the Special Collections and Archives Portal

man000177 168

Image

File
Download man000177-168.tif (image/tiff; 26.88 MB)

Information

Digital ID

man000177-168
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

sMFC July 2 3, 1951. CAPITAL AUDITIONS FOR 1951 (ept.l**+.**) From Page 10 of Exhibit »B" in the Rate Case: Production Company $ 69,250 Water Utility # 230,000 The details for the Production Company are' given in Table X, Bxh. "B*. vizi Pipe line to connect Wesleigh Tract $ 2,110, Pumping station and- pipe line to serve West Side District 40,340. Install pumps in Wells 8, 10 and 11 18,800* Install automatic electric starting and timing controls at booster stations and wells 4,000 Install telemeter equipment and circuits to record water level in reservoirs and pressures in L.V.L. & W. CO. water mains 4.000 total | 69,250 The details for the Land and Water Company- 1951 estimates: A, Improvements for reinf. of mains to increase capacity and pressure Construct main, vicinity of A and Jackson ats. Construct main, North Main St. West Side Trans. Line various locations 3600 ft, 3" and 6H, $ 13,150 640 ft 6* 2,300 4280 ft. 12« to 8» 25,200 5500 ft. 8" and 6” 25.000 * 65,650 B. Subdivisions- Under construction Westleigh Tract, W. Charleston Blvd Ream Tract, Bracken Ave. Southridge » , Between loth and 11th Love Tract, E. Charleston Blvd Ridgeview Tract, Columbia Tract, E. Charleston & Eastern C. Known Proposed Additions Westleigh Tract, W. Charleston Blvd Mountain View , , Charleston Blvd. Southridge Tr. , Between 10th and 11th L.¥. Pub. Housing Proj,, Washington & H, Econosgr Tract, 1. Charleston Blvd. Columbia Tract, E. Charleston & Eastern D. Anticipated further Subdivision Development Various locations Grand total 3060 ft. 8« and 6M # 13,000 330 ft. 6« 1,000 2480 ft. 8W and 6" 10,000 990 ft 8» and 6» 3,000 1500 ft. 8“ and 6* 5,500 1950 ft. 6* - 7,300 $ 39,800 9000 ft. 6" 1 35,000 5000 ft. QBand 6" 27,500 4500 ft. 8" and 6* 18,000 2300 ft 8* and 6" 10,000 3000 ft 6" 11,000 9800 ft 8" and 6n - 4o;ooo $ 141,500 55,000 $ 230,000 NOTE* Items A, B, C, and D are covered by advance deposits. (HFC) > v