Skip to main content

Search the Special Collections and Archives Portal

upr000050 160

Image

File
Download upr000050-160.tif (image/tiff; 23.52 MB)

Information

Digital ID

upr000050-160
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Mr. Knickerbocker? I I April 1. 1936 With, the expense of a mew well to be considered, I dislike to mention the necessity for renewal of the wooden pipe line between the reservoir and shop yards fence, but it is in a deplorable c o n d it io n , averaging about 50 leaks per week, this pipe has been patched and repatched u n t i l there is not mush left to hold the r e p a i r plugs, and If this pip# line gives way there will not be sufficient water delivered to supply the town through the single iron main which parallels it underground# fhe estimate made last year to cover cost of drill** ing a IE-inch well, 600 feet deep, was #5,900, plus $4,200 for a cast-iron line to bring the water from the new well to the settling basin. %is. was the contract price, but by renting a well-rig and using railroad forces, a saving of about |l§00 on this estimate could be made. 1 am convinced that this is the one solution to our problem, as an additional reservoir or reservoirs would not correct the condition because the peak load does not vary so much between day and night as it does between winter and summer, and sufficient water could not be stored dur­ing the winter months to take care of the demand during the summer« Our revenues have held up very nicely during the past year, and have not taken any decided drop on account of the large number of men cut off with the completion of Boulder Barn.