Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
(COPY) Las Vegas, Nevada, May 1$, 1937- I have prepared applications for permit to appropriate water, to be file d with the State Engineer of the State of Nevada by Las Vegas Land and Water Company, covering the water developed by the new w ell. One of said applications is for 2.70 second feet for municipal purposes, and the other is for 2 A 1 3 S second feet fo r irrigatio n purposes. I enclose herewith two copies of each of said applications. I am also enclosing a memorandum showing the water supply at Law Vegas, from reports made to me by Mr. Bracken. Before filin g these applications, I believe it would be w ell to have the Engineering Department check them over to see that my computations are correct. When checked, the o rigin al applications can be signed by Mr. Bracken, as Vice President. I think it would be w ell also fo r the Engineering Department to check over the data, copy of which is enclosed, with the view of determining whether or not there should be a new contract between the Railroad Company and Las Vegas Land and Water Company, to take the place of the existing Contract, Audit No. 7322, dated March 3 0 , 1 9 2 9 . As I understand it , the new well was d rille d by and at the expense of the Railroad Company, but the fu ll amount of the water developed is to be used by the Land and Water Company. You w ill note that a part of the land described' in the Application for irrig a tio n purposes and which is now being developed by D. G. Lorenzi under his lease, is Railroad land. There is no reason, however, why the application for permit to use the water on this land cannot be made by Las Vegas Land and Water Company. Mr. E. £. Bennett: (sg d .) Leo A. McNamee Enc. cc - Mr. W. R. Bracken - with copy of Applications.