Skip to main content

Search the Special Collections and Archives Portal

man000176 32

Image

File
Download man000176-032.tif (image/tiff; 26.88 MB)

Information

Digital ID

man000176-032
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

J A M E S M . M O N T G O M E R Y C O N S U L T IN G E N G IN E E R 15 N O R T H O A K L A N D A V E N U E P A S A D E N A 1, C A L IF O R N IA October 23, 1953 Mr. Thomas A. Campbell, President Las Vegas Talley Water District 900 South Fifth Street Las Yegas, Nevada Be: Las Vegas Land and Water Company Projects W 23-I-89, W 23-1-101 and w 2 3 -1 -1 0 9 Dear Mr. Campbell: Returned herewith are approved copies of three applications for water main extensions which were submitted by the Las Yegas Land and Water Company. These three applications, W 2 3-I-89, W 23-1-101 and W 23-1-109, were previously held up pending a decision by the Board of Directors regarding policy on making extensions by competitive bidding. At the adjourned meeting of the Board held yesterday, October 22, it was decided that competitive bids would be re­quired for future extensions of the water system. However, the three subject applications are already under contract and work . has started on the pipe lines. The Board therefore decided that, subject to our approval of the contract prices, the projects should be allowed to proceed. The contract prices have been checked by this office and have been found to be reasonable. J 10/26/53 Drawings relative to above projects and Detail of Estimated Expenditures returned to JM M this date. District already has copies of same in District's file . Along with this letter, said drawings and Details were forwarded, apparently inadvertently, and TA C returned same this date. Very truly yours JMM:mg Enclosures