Skip to main content

Search the Special Collections and Archives Portal

upr000280 120

Image

File
Download upr000280-120.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000280-120
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Page No._t, 2 Year w.o. No. Description Amount Total for Year 19-45 3180 (Gont1d) No. 2, settling basin No. 3, booster and fire pump houses, fencing, power line between Reservoirs 1 & 2 and in­stalled pumping equipment. •55 990 55 990 19/+6 3180 Description same as above. 261 405 261 405 1947 3180 Description same as above. 1 614 1 614 1948 3180 Description same as above. 6 344 6 344 1949 4261 Constructed Booster pump house, 1657f of new pipe lines from pump house to connection iwith distribution line at Highway 95, power line and installed pumping equipment, including automatic pressure system with 2 steel pressure tanks, fencing, driveway, etc. 22 162 22 162 1950 4261 Description same as above. 5 584 4500 Constructed 1534' of pipe line connect­ing Well No. 8 to Settling Basin No. 3. 7 644 13 228 1951 4712 Constructed 41' of pipe line to connect with distribution line near Reservoir Nc. 2. 2 076 4728 . Installed pumps in :;-rells No.-8, 10 and 11 and constructed pump house at Well No. 11, including power connections and equipment. 18 652 4789 Constructed pumping station, po- r line, • 2409' of new pipe liuots. from pip ping station to distribution system in Bonanza Rd. to serve West' Side District. 34 297 55 025 Total