Information
Digital ID
upr000211-236
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.its resources. By drawing heavily from this stone we will secure a full share of its ultimate production. As a matter of information, present production capacity as furnished today by Mr. Folger, follows: Well Ho. l - 1 « 2 ---------------- * ; * x — — — - — | # 4 - Big Spring ---------------- Little Spring - - - - - -- Estimated increase to be developed as per above recommendationi Middle Spring - ---- -- Pumping - - - - - - - - - Hew maximum prodn. (Bet.)- - 2 additional upper zone welle with pumping facilities would develop ? (Est.) -------------------- Can be made available for next summer if needed - - - 111 III 1 . Considering that it is proposed to provide a townsite near the Magnesium plant with Borne 2,000 homes for plant operating employes and to supply water for same from Lake Mead, it seems the above program will protect against any increase in 1 866 240 GPD 978 480 £--- 907 200 * 447 120 ? 381 024_ 553717 3§Q^JL— 160 1 7QQ 560 I 6 498 144 GPD 7 * 1 1 I 300 000 GPD 900 000 * 1 200 000 " 7 698 144 GPD 1 800 000 • 9 498 144 GPD