Skip to main content

Search the Special Collections and Archives Portal

upr000173 426

Image

File
Download upr000173-426.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000173-426
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Las Vegas - March 22, 19k8 Mr. Frank Strongs I eo - Mr, a, L. Adamson) Th,© Auditor recently set up a new depre­ciation schedule for oast iron pipe, its life ex­pectancy varying with the diameter of pipe. It was necessary then to re-check all of our pipe line foot­age to segregate the main line footages by diameters and date installed, and we hare Just completed the last of the AO prints to support his records. Copies are being sent Mr, Adamson for his records. It has been our practice to send your office a copy of each Work Order dose-out report to the Auditor with a brief description therein of manner in which pipe line had been Installed. It is some­times difficult to describe minor changes in location of pipe lines and I am wondering if it would be agree­able to you for the AC prints to be made here. We could include thereon the actual location of valves and fire hydrants thus giving us a more complete record. If you ooneur, will you please send 3 copies of print covering each Work Order issued in the future so we can indicate thereon actual construction of lines, and copies will be sent your office as well as the Auditor, A. M. Folger