Information
Digital ID
upr000218-294
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Form 2191-B 11-43-1M M i Time Filed. UNION PACIFIC RAILROAD COMPANY „ TELEGRAM Omaha - November 7> 19^7 MAILG-RAM 353-2 Mr. Prank Strogng: j 1 pfS w f H (CC - Mr. Wm. Reinhardt Mr. P. J. I$rnch Mr. W. H. Hulsizer) Your S-8 of November ^-th, recommending installation of a 2^B pressure reducing valve in the 2^H 0.1. pipe line located along Charleston Boulevard, Las Vegas, Involving an estimated capital expenditure of $3»000. Since this main was installed under LA&SL AFE No. 61, Work Order 3180-1, and there is sufficient unexpended balance under that authority to cover the cost of Installing the reducing valve, you may arrange to reopen Work Order 3180-1 and charge same to that authority. G—210