Skip to main content

Search the Special Collections and Archives Portal

upr000264 208

Image

File
Download upr000264-208.tif (image/tiff; 23.09 MB)

Information

Digital ID

upr000264-208
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

Water Well - Las Vegas Los Angeles, June 15, 1943 Mr. Prank Strong: Xour letter of June 3th, Pile 1-733^» regarding Las Vegas Land & Water Company Work Order 59$ - water well Las Vegas. Regarding prices for the required easing which can be furnished by Mr. Don T. Christensen of Compton, California, and confirming conversation this morning, it Is our understanding that this is a welded type easing and will be Installed with welded joints. According to your letter, Mr. Christensen will 'Im$ sell the 12" casing with 1/4* wall at $4.00 per foot, 9- and the l6" casing with 3 A 6 " wall at $4.75 per foot. We can purchase this oaslng with identical dimensions from the Southern Pipe & Casing Company of Azusa at $2.37 per foot for the 12" and $3*05 P0r foot for the 16", f.o.b* Azusa, 6 0 to 9° day delivery. The Western Pipe & Steel Company can also furnish the 12* at $3*1-5 P®r foot, and the 16" at $3*35 Per foot immediately from steel now in transit, delivery JO days,.,_ or from steel in stock immediately delivery at $3 * & 5 per' foot for the 1 2 " and $3 . 9 5 P0* foot for the 1 6 ", f#o.b« j Los Angeles. If time permits, it is my suggestion that we plaee order with the Western Pipe & Steel Company on the basis of 3 0 days delivery. Do you oonopr? C. w: x JUN 16 1348 # i v> Vu2