Skip to main content

Search the Special Collections and Archives Portal

upr000180 172

Image

File
Download upr000180-172.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000180-172
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

XX30QCXmmXJOQQOQQC Federal Development Co* #2 The above mentioned agreement provides that the construction of the H u e shall be in accordance with A*W*W.A* specifications and the workmanship, material and installation shall be subject to the approval and acceptance by a duly authorized represen­tative of the Company* A*W*w*a* epeolfioatlona provide, among other things, that! 1 « Onless ordered by the Engineer, no blocking shall be used to support pipe* Z - Any part of the trench excavated below grade shall be refilled with thoroughly compacted approved material* 3 - The pipe shall be laid so that the barrel of the pipe will have a bearing for the full length* 4 - Selected backfill material free from rock or boulders shall be deposited in the trench simultaneously on both sides of the pipe for the full width of the trench and to an eleva­tion of not less than 6 Inches above the top of the barrel of pipes with diameters 8 inches or less, leaving the joints exposed for examination during the pressure test* The baokfill material shall be thoroughly compacted under and an each side of the pipe to provide solid backing against the external surface of the pipe* 5 - Succeeding layers of backfill may contain coarser materials, and shall be free from brush or any other perishable or objectionable matter that would prevent proper consolidation or that might cause subsequent settlement, and shall be compacted thoroughly* 6 - flo rock or boulders shall be used in the backfill for at least one foot above the top of the pipe, and no stone larger than 8* in its greatest dimension shall be used in the backfilling*