Skip to main content

Search the Special Collections and Archives Portal

upr000221 129

Image

File
Download upr000221-129.tif (image/tiff; 26.85 MB)

Information

Digital ID

upr000221-129
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    UNION PACIFIC RAILROAD COMPANT L a s V e g a s , Nevada Water W ell #9 History- Location: 1408’ South and 1185* West from corner, Section 31, 20-61, M. D. B. & M. Spudded at 10:00 A.M ., A p r il 1, 1942. D r ille d 18-1/4” hole to 315 on A p r il 2, 1942. 4/ 2/42 - Started running 13-3/8*' casing at 4: 20 P.M. Shoe o f 13-3/3” stopped at 43.5* Started p u llin g easing out o f hole at 5*00 P .M ., A p r il 2. 4/ 3/42 - Reamed hole with 18-1/4” Crum h it to bottom. Measured out. Corrected bottom was 313. Ran 292.321 (8 jo in ts ) o f 13-3/3" - 43# South Chester Tube Go.1s lapweld short thread 8-V thread casing in h ole. Cemented 13-3/8" shoe at 280.22 using 225 sacks V ic to r M odified Cement. None treated. Cement mixed and pumped down by the r ig s pumps and crew. Two Perkins plugs used. Baker cement flo a t shoe on bottom o f casing. Started running casing at 6 :4 0 A.M. ) Finished running casing at 10:30 A.M. ) 3 h r s ., 50 min. Started mixing cement at 10:55 A.M. ) Finished mixing cement at 11:26 A.M. ) 31 min. Started pumping down cement at 11:32 A.M .) Plugs bumped at 11:47 A.M. ) 15 min. Finished cement job at 11:47 A .M ., A p r il 3* 1942. W ell stood cemented 36 hours. 4/ 5/42 - Ran in , found top o f cement and plugs at 277. D r ille d out 13-3/8" shoe at 12:00 Midnight o f A p r il 3rd. D r ille d ahead to 3 64. While d r i lli n g at 364 at 8:15 A .M ., A p r il 5th, w e ll started flow in g water. W ell flowed fr e e ly u n t il gate was in s t a lle d . W ell was then closed in at 1:00 P .M ., the same day. W ell was k i lle d at 11:45 P.M. with mud. W ell remained dead from 11:45 P.M. A p r il 5th u n t il 7:45 A.M ., A p r il 6th. 4/ 6/42 - While preparing to run in with the d r i l l pipe at 7:45 A .M ., w e ll started flow in g again. The gate was again in s t a lle d . The w e ll was then allowed to flo w through the gate while the Union P a c ific R ailroad Comparer made a te st o f the amount o f flo w with th e ir w ier. The w ier showed a flo w o f 6-5/8" equal to 1238 gallon s per minute. The pressure at the top o f the w e ll when closed in w^.s 22.5 lb s . The w e ll was again k i lle d with mud at 11:30 P .M ., A p r il 6th.