Skip to main content

Search the Special Collections and Archives Portal

upr000084 76

Image

File
Download upr000084-076.tif (image/tiff; 26.12 MB)

Information

Digital ID

upr000084-076
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Form 30-2 6-31-30,000 SHEET 1 OF], SHEETS WORK ORDER AUTHORITY—DETAIL OF ESTIMATED CREDITS L03 ANGBLE3 l 3ALT LAKE RAILROAD COMPANY _______ ________________DEPARTMENT . ____________________________:____________DIVISION ISlT 111________ location: • Nevada - Third Subdivision / I GENERAL MANAGER’S NO. ___________ n„rBIPTir,M ' / state Noroda.—!--------------- * Estimated lodger value of eight hunk houses and ) VALUATION SECTION no.40----------------- port 0 Hft nc 4) ^ 5 to 1)0 r#t3,r@d O I department no.__________________ R. AND E. ACCT. No. DESCRIPTION QUANTITY UNIT UNIT COST LABOR MATERIAL OR TRANSPORTATION CHARGES TOTAL 35 20 Between Sngr. 5ta« 6500 and 6507 located in shop >ard near ell *tcrape facilities. 800.00 950.00 10545.34 601.81 182.91 13080.06 Bailed 13 080 Bunk house No.3 1911- W.C. U88 Bunk house N°« 5 1915** .W.©-» unknown Bunk houses 1»2 *4*6,7 and 8 Viator Jp| steam lines 1923- 4269 lap rove meats Bunk house iJo° 1 1927- 7362 i'o be removed by outside party for value of salvage or a nominal oonaidoration. *_______ $13 080 5.___________ *_______ ESTIMATE BY DATE_ ESTIMATED CREDIT TO “RESERVE FOR PROPERTY TO BE RETIRED” hojmT/ ESTIMATED CREDIT X.9 “PROPERTY RETIRED AND NOT TO BE REPLACED” ESTIMATED CREDIT TO “EQUIPMENT RETIRED FROM SERVICE” - ESTIMATED CREDIT TO________.____________J_____________________________________________ ESTIMATED CREDIT TO “DONATIONS” OR “GRANTS IN AID OF CONSTRUCTION’4