Skip to main content

Search the Special Collections and Archives Portal

upr000279 171

Image

File
Download upr000279-171.tif (image/tiff; 23.65 MB)

Information

Digital ID

upr000279-171
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    MEMORANDUM To: R. L. Adamson: Referring to the question as to facilities served by electrical current through Circuit #1 and Circuit 02$ as reported by Maintenance of Way forces at Las Vegas: In an effort to determine definitely which of the water facility motors are Included in electric meter read­ings referred to above, following is information developed in conversation with Mr. Cotmire of the Electrical Depart­ment, Las Vegas: Mr. Cotmire advises that in recording the electric meter readings monthly he records them as readings of meters Panel #1, Panel #2 and Panel #3, etc., across the entire board. He states, that Panel #1 Is the lead-in panel, Panel #2 records the current used on electric circuit serving Charleston Boulevard reservoir and Bonanza Village pump­house only, Panel #3 serves Reservoir #1, wells and all other motors in the water field. In order to & efinltely tie-in the panel number with the circuit number used in the Maintenance of Way reports, and Incidentally to definitely establish which facilities are served by each of the so-called Circuits #1 and #2, I obtained from Mr. Cotmire the folllwlng meter readings taken in September, October, November and December: L o s A n g e l e s - M arch 9 , 1 9 5 1 1 - 7 3 3 4 September October November December :Meter KWH :Meter KWH :Meter KWH :Meter KWH : Read- :Read- :Read- :Read- : lng Used: ing Used :.in« Used :.lng Used. • Panel 02i 4681 e # 450: 5131 428 :5559 423 :5982 Panel #3: 9044 a 1371: 0415 778 :1193 524 a :1717 Using the readings indicated in the above tabulation and the amount of current consumed as a guide and referring to tabulation in this file, data for which was obtained from Main­tenance of Way forces, it seems to be definitely established