Skip to main content

Search the Special Collections and Archives Portal

upr000287 172

Image

File
Download upr000287-172.tif (image/tiff; 24.09 MB)

Information

Digital ID

upr000287-172
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    ) 7 ¥ ~ Z L DEC 11 1953 Las Vegas, Nevada December 7, 1953 Mr. E. E, Bennett: cc: Mr. A. D. Hanson Mr. W. C. Perkins \ 953 I transmit herewith a conformed copy of the Amended Application, together with copy of supporting map, for permission to change the point of diversion 2.5 c.f.s. from Well No* 1 to the so-called shop well. The original application designated as Serial No. 15140 was filed in the Office of the State Engineer on June 17, 1953. Thereafter the original application was amended at the suggestion of the State Engineer and the amended application, together with the supporting map, was filed in the office of the State Engineer on August 5, 1953. The required notice by publication was published in the Las Vegas Review Journal on October 5, 12, 26 and November 2. I I am not advised of any protests to our application and it is my understanding that further action on the same is being withheld by the State Engineer at our request I until such time as we are in a position of placing the I water to beneficial use at the new point of diversion upon completion of the work authorized by our Work Order I 5294. CMC rib