Skip to main content

Search the Special Collections and Archives Portal

upr000061 379

Image

File
Download upr000061-379.tif (image/tiff; 26.81 MB)

Information

Digital ID

upr000061-379
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

,T.« ' T m jmjbletBWP EXTRAORDINARY OPERATING EXPENSE SnIacilities used jointly AT LAS VEGAS. NEVADA w.o. Date Description Amount '10% For One Year"’- 2982 1$20 Connecting new pipe lines $ 61.61 3747 1922 Excavate and "backfill; also con- nect and install new pipe line 1438.53 Total - January 1, 192 5 - - - $1500.15 $15 0.01 4707 1925 Temporary settling "basin and con- trol of flood waters $ 3774.08 558 9 1925 Replacing pipe lines and renew- ing roof and fan at Springs 9287.68 0-30 4-24-25 Renew 200' of 16" wood stave pipe 810.00 Total M January 1. 1926 - - - $15371.90 #1537.19 6871 12-31-26 Cut roof for ventilators on Spring House $ 3.08 Total - January 1, 1927 - - $15374.98 $1537.50 0-109 192 7 Renew in kind 3750* of 16" wood stave pipe #10250.00 0-149 192 7 Repair water facilities 358.00 7393 11-30-27 Clean out spring and remove con- crete wall 49.44 Total - January 1, 1928 |26032.42 $2603.24 0-208 1928 Repair water facilities I 233.00 Total - January 1, 1929 26265.42 #2626.54 8248 1 [Not Comp .) Reservoir and settling "basinfEst) 2300.00 8577 ff 23" pipe line 2220.00 Total - January 1, 1930 f'3078'5 #3078.54 f NOTE:- Extraordinary Operating Expense spread over 19 year period Los Angeles, Calif, May 27, 1929.