Information
Digital ID
upr000335-046
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Approved Form 3G-A, Ho. - Supplement Ho. 1 Los Angeles, Calif., December 21, 1918. Mr. C. C. Barry: Herewith loin 30-A, Maintenance Engineer’s Ho. 17-82 - Supplement Ho. 1, approved under General Manager’s Ho. 1965 - Supplement No. 1, revised to cover e/tire project of replacing 18” riveted steel pipe line from reservoir to North line of Main street, with 16* vitrified pipe encased in concrete and renewing and rearranging water line to stand pipe and coach hydrants at Las Vegas, Nevada, amounting to $23,29p.l^>i H-Y Enel CCi Mr. H.V.Platt (2) ' MMrr..TA ..Mp&,gCuullrleen Mr.J.H.Cragin c\/K >5