Skip to main content

Search the Special Collections and Archives Portal

upr000334 44

Image

File
Download upr000334-044.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000334-044
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    MEMO IOS ABGELES, Bov ember 30th-1917 LAS VEGAS PIPE LIBE: Repairs to— Pile MR. G. E. DREW: pipe line at Las Vegas* In connection with making repairs to the / "Fix” should be repaired at this time, jin making these repairs a section of the concretar about 8 inches in width, should be cut away, the p i n t refilled with mortar and the pipe surrounded by a concrete band 6 or 8 inches In thickness. / You should at/once repair the joint which was removed at Station 35. pie joints should first be made with cement grout with a gaivanized iron band andftfter the grouting has set the wlhs^e/section of pipe shduld be en­cased in concrete. Befor^this section of pipe is placed, you should endeavor to repair the leak about 100 feet below the opening, by sending a man on the inside of the pipe. set at Station 35, the openings further down the line should be restored in the same manner as at Station 35. One open­ing should be left about midway between Station 35 and zero so as to test from that point. While you are waiting fbr the concrete to AM/CRG