Skip to main content

Search the Special Collections and Archives Portal

upr000173 78

Image

File
Download upr000173-078.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000173-078
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    August 23, 1 9 ^ w 2 3 - 1 - 5 1 Nevada Construction Company ^21 West Bon&nsa Hoad Las Vegas, Nevada Gentlemens Application has been received to extend the water stains to and within the new Subdivision known as Orestwood Homes on last Charleston Boule­vard. fh# extension oontemplates 2550 approximately feet of 8-inofe oast iron pipe from the present end of the line at Charleston Boulevard and Chapman Drive, and approximately 2650 feet of 6-inoh cast iron pips to ssrvd Blocks 1 and 2 within the tract. The water main is to be installed in ac­cordance with AWWA specifications, with cement Joints and at least J6 inches of cover. Contractor to f u m i e h all labor, tools, equipment, supervision and other facilities required to construct a com­plete water line in accordance with the above men­tioned specifications! owner t© furnish pipe line material and fittings. Xou will be required to carry Workmen*s Compensation A Public Liability A Property Damage insurance with an Insurance company designated by the Owner, ton will also be required to furnleh a bond for the full amount of your proposal. Cost of premiums on the above insurance and bond will be borne by the owner. ton are hereby invited to submit, on or be­fore August 3Cth, a lump sum proposal for construction of the proposed water line, print showing location of the proposed line is available at the office of the Las Vegas Land A Water Company. Very truly yours. General Manager