Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Fire Pump and Starter Panel Mr, Frank Strong? Los Angeles, December 10, 1945 36-SD-6342-W (oc - Mr. F. E. Cragin) Referring to your requisition 64-155 covering a fire pump and starter panel for use at Las Vegas as covered by my purchase order 36-SD-6342-W placed with the Worthington Pump & Machinery Corporation* I quote their letter to me of Deoember 8th: “In reference to the subject order, we are purchasing the motor and control from the General Eleotrlc Company. The General Electric Company advise that the best shipment they are able to make on the motor is April 9, 1946. Further, their shipping schedule on the control is June 1 1 , 1946. As these shipments are somewhat longer than the General Electric Co. originally anticipated, we would like your authorization to proceed with the order on this basis. "We have checked with other suppliers and have not been able to better the shipping schedule listed above. “Thanking you for your cooperation in this matter, we are Will you please advise if the delivery offered will be satisfactory. If not, do you know of any substitute equipment which will take care of the requirement. llll§ JjGP-M j/ H.J1'9 45 DEO J-1