Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
August 23# 19^8 W 23-1-51 Independent Plumbing Company 1621 Fremont Las Vegas, Hevada Gentlemen: Application has been received to extend the water mains to and within the new Subdivision known as Crestwood Homes on last Charleston Boulevard, the extension contemplates approximately 2550 feet of 8-inoh cast iron pipe from the present end of the line at Charleston Boulevard and Chapman Drive, and approximately 2650 feet of 6-inoh oast iron pipe to serve Blocks X and 2 within the tract, fhe water main is to be installed in accordance with AWWA Specifications, with cement joints and at least 36 inches of oover. Contractor to furnish all labor, tools, equipment, supervision and other facilities required to construct a complete water line in accordance with the above mentioned specifications! owner to furnish pipe line material and fittings. Xou will bs required to carry Workman’s Compensation and Public Liability A Property Damage insuranoe with an insurance company designated by the Owner. Xou will also be required to furnish a oond for the full amount of your proposal. Cost of premiums on the above insurance and bond will bs borne by the Owner. Xou are hereby invited to submit, on or before August 30th, a lump sum proposal for construction of the proposed water line. Print showing location of the proposed line is available at the office of the Las Vegas Land and Water Company. Very truly yours, General Manager