Skip to main content

Search the Special Collections and Archives Portal

upr000174 228

Image

File
Download upr000174-228.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000174-228
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

August 23# 19^8 W 23-1-51 Independent Plumbing Company 1621 Fremont Las Vegas, Hevada Gentlemen: Application has been received to extend the water mains to and within the new Subdivision known as Crestwood Homes on last Charleston Boule­vard, the extension contemplates approximately 2550 feet of 8-inoh cast iron pipe from the present end of the line at Charleston Boulevard and Chapman Drive, and approximately 2650 feet of 6-inoh oast iron pipe to serve Blocks X and 2 within the tract, fhe water main is to be installed in ac­cordance with AWWA Specifications, with cement joints and at least 36 inches of oover. Contractor to furnish all labor, tools, equipment, supervision and other facilities required to construct a com­plete water line in accordance with the above men­tioned specifications! owner to furnish pipe line material and fittings. Xou will bs required to carry Workman’s Compensation and Public Liability A Property Damage insuranoe with an insurance company designated by the Owner. Xou will also be required to furnish a oond for the full amount of your proposal. Cost of premiums on the above insurance and bond will bs borne by the Owner. Xou are hereby invited to submit, on or be­fore August 30th, a lump sum proposal for construction of the proposed water line. Print showing location of the proposed line is available at the office of the Las Vegas Land and Water Company. Very truly yours, General Manager