Skip to main content

Search the Special Collections and Archives Portal

upr000332 16

Image

File
Download upr000332-016.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000332-016
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    m Meter a t io e p lan t. Los Angeles, G al., Aug. 16, 1905. F ile 613. Mr. A. L. Jones, D iv isio n Engineer, Las Vegas, Nev. Lear S i r : This w i l l be presented to you by Mr. Peters who represents the n ation al Meter Company from which we procured the meters that have been put in at the Armour Company's ic in g plant at Vegas. Mr. Peters is desirous o f in sp ectin g the meters to see what the reason is the 3 inch does not work s a t is fa c t o r ily , and you w i l l o b lig e me b y .a id in g him in his m ission. I t may be that th§ people at the 3/ce plant did not put on the 7 to 3" tap er reducing p iece th at was/ sent out to carry the water to the meter. I f they have not done so, /they cannot expect to get the f u l l e ffic ie n c y o f the machine. Yours ^ru ly, C hief F.hgineer. e g t - l r t t