Information
Digital ID
upr000056-006
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.August 5, 1935 Mr* Calvin* Within a week or ten days we will have completed our new settling basin and pipe line to handle waters from the big artesian well* After this is done the well will be en* tirely inclosed from view, and I would like very much, ifVou contemplate passing through before that time, to take you up to see the well while it is still flowing in the open* We ean make this trip very easily while train is being taken care of in the railroad yard, I thought possibly the enclosed copy of wire from Mr. Barry and my reply to same is referenee to revenues covering our water system for the past five years will be interesting to you. Tours truly, WRB/MC