Skip to main content

Search the Special Collections and Archives Portal

upr000054 212

Image

File
Download upr000054-212.tif (image/tiff; 26.88 MB)

Information

Digital ID

upr000054-212
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

>2< Z bare discussed the subject of water consumption % various types of equipment with representatives for Frigidaire, Carrier, Chrysler, Worthington and York equipment, who advise that generally the consumption of water by air conditioning and refrigeration equipment per horsepower or ton of capacity, with estimated eoet of water at lOjrf per 1,000 gallons, is as follows} Commercial Use Air Conditioning Equipment (16-hr.dayj .(a) with recirculating system (b) Without 1 I Refrigeration Equipment (24-hr.day) T (a ) wi th recirculat ing sya teo^^ (b) Without * * lee Makl: W I Machines (Ton Per 8-hr .day) recirculating ays tern • Cooling water • For Ice - (b) Without reoireulating system - Cooling water - For iee * Evaporative Coolers (16-hr» day) (a) With rooirouAat ing 'system per 1000 CFM of copecity (b) Without recirculating system pSFlOOO CFM of capacity Domestic Use Air Conditioning equipment (8-hr* day) ------------“?ST^4----- i equipmi.............._ Ta ) Wi th reoirculatlr^ sya'tem- W Without • ? Estimated Cost of as followsi per ur Fer mo. Month 5 1,440 | 0,144 180 57,600 5,76 5 8,160 0.816 180 86,400 8.64 s 50 7,920 0,792 w 180 ? 50 810 50,400 5,04 2 860 0,096 20 9,600 0*90 5 780 •078 180 88,800 2,88 81 be amended to read,