Skip to main content

Search the Special Collections and Archives Portal

upr000216 185

Image

File
Download upr000216-185.tif (image/tiff; 23.52 MB)

Information

Digital ID

upr000216-185
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Los Angeles - August 6, 19^5 1-733^ Mr. W, R. Bracken: Referring to your letter July 30th, ana with return of the copy of form letter from City Manager of Las Vegas con­cerning sidewalks, affecting some of our North Main Street property. I don't think the City will take any action In Install­ing the sidewalks and billing us without first Issuing a preemp- tory order. X have no one to send up there at this time to take elevations and endeavor to work out a feasible plan that will meet the City's Interests ami those of our tenants, and It may be some time before we can do this. Meantime, If you can get a few minutes of McKee's time he mlgit be able to run some elevations there and work out some kind of a scheme that will be satisfactory to both parties. As a matter of Information, E. B. Hall expects to move his rig up there in abotxt two weeks and drill Well No. 11. We will, of course, shut It In until we get the other work done, but I want to take advantage of the opportunity to secure the rig and get that much out of the way. It will probably be around September or October before we get our WPB approvals so we can award contract for the reservoir, settling basin, etc. Prank Strong Qrig. 1—7334 - A * J* Carlono Copy * - P* 0. Miller and Pave Grossm an 7334 - Water Facilities . W.HJ. * Au- 9 1345