Skip to main content

Search the Special Collections and Archives Portal

upr000277 123

Image

File
Download upr000277-123.tif (image/tiff; 26.25 MB)

Information

Digital ID

upr000277-123
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    V The above condition would obtain during 1929 with existing rates increased 225$; however, during 1930 additional rental to Railroad Company would increase to ta l charges to such an extent that p ro fit would only he $7,600. Revenue less expenses, not considering fixed charges, during 1928 amounted to $7,150.65, while during 1927 this f i g ­ure was $3,014.52. Should this increase he continued, a more favorable result would he realized under both statements 2 and 3. As set forth in previous correspondence, there is p o s s ib ility of las Yegas City deciding upon municipal owner­ship at any time we desire to increase rates or make any rad­ical charges in policy or rates a ffe c tin g that City. I f we are to discontinue former p olicy and increase the rates, it is my opinion that increasing fla t rate by 225$ and furnish­ing adequate water (at least for immediate future) w ill be more acceptable to the people and the Commission than going . on meter basis as cost to users would be less under that arrangement. In this connection, I b elieve we have a strong argument in statin g that i f we are not permitted to increase existing fla t rate, as above mentioned, it w ill be necessary to place a l l users on meter basis in accordance v/ith rate schedule ]?orm 14; however, it is my understanding that Com­mission can reduce th is rate. -5 -