Skip to main content

Search the Special Collections and Archives Portal

upr000166 177

Image

File
Download upr000166-177.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000166-177
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Las Vegas - march 16, 1943 W 23-3-3 Mr. Frank strong; Weir measurement* were made of the production of the wells and springe yesterday, and X an attaching hereto the result thereof, together with a re-statement of the May 5, 1942 measurements for ready comparison. You will note an increase of almost half a million gallons per day. The weir boxes for the Big Spring and Well Ho. 2 are very well set with a straight run of at least 60 feet prior to passing over the weir, as recommended by State Engineer. However, the weir box for Well Ho. 1 is too ©lose to the well and appears to be too short so that the velocity of the water distorts the reading. We measured 74- Inches on this weir box but this was obviously incorrect, so we checked It with a still pond and found ? inches even which we have shown in the attached table. The same difficulty is apparent at the weir box for Well Ho. 6. This might be remedied in a measure If the overflow pipe were trained in at the bottom Instead of the top of the weir. X understand there are three pumps on hand here, Intended for Wells Ho. 4, 7 and 9. Ho. 9 is now producing over a million gallons per day and in-as-much as it has a metal derrick it would probably be much better to move the derrick over to Ho. 10 and Install a pump therein? or if this Is not desirable it could better be used on Ho. 8. The Wallace & Tiernan representative is here today to install the chlorlnatdr In pump house at Open Spring. If it has been decided to go ahead with this installation, X think it is very Important that the line be thoroughly cleaned out thru weir box at settling basin and samples sub­mitted for bacteriological analysis before the production from this souroe is allowed to get into the City mains. This is extremely important and X trust there will be no slip-up on the part of our employees. l A M T .fiUBHtf