Information
Digital ID
upr000218-310
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.\ 6 Mr, V. W. Smith: New Water Lines, including valves, fittings, etc., replacing water lines retired: _________ 12“ C.I.P. - SH 12“ W.I.P. 12“ Transits Cl. 100 H H 11 N 16" C.I.P. Cl . 150 18“ Transits, Cl. 100 2 M n N Water Lines retired including fittings, valves, etc.: 10“ C.I.P. 11^2““ Traf nsits Lin.Ft. N HN H • It 35^.o 9 m 219.3 53.^ 166.2 Total - 2,228,0 Lin.Ft. HIt 2 2 0 .0 812.0 1,196.0 Total - 2,228.0 (See Operating Expenses for Contract Cost) Transformer Mat, 12* x 12'^ Concrete, plain. Excavation, Com. Contract Cost - Mat, C. *Y. 1*8 $ Power Line; New Power Pole Line extending from connection to existing pole near old reservoir to new reservoir. (Company Forces) Lin.Ft. 5*571 Contract Cost to blast holes in solid rock for portion of poles in above power line, $ Place 3 additional power wires on existing pole line from pole near old reservoir to power house at Las Vegas and installed new panel board in Power House - Company Forces, 210.0 0 , 523.7- I