Skip to main content

Search the Special Collections and Archives Portal

upr000018 11

Image

File
Download upr000018-011.tif (image/tiff; 31.08 MB)

Information

Digital ID

upr000018-011
    Details

    Member of

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    \ SIMM m upon the production and delivery to it of a certificate of its said engineer that work has been done to his satisfaction to the value of $___________________________» and 'kk® furfcker sum of> $_____________ upon the production of a like certificate that work to the value of |_____has heen so done; and the further sum of <|______________ upon the production of a like certificate th&t work to the value of i| has heen so done; and the remainder of the said sum of $ within sixty-five days from the completion of said contract and upon the production to the owner of the certificate of said engineer, that said "building has heen in all respects completed in accordance with the contract and to his satisfaction. III. It is hereby further agreed by and between the parties here­to that the specifioations* conditions, and the drawings hereto at­tached are intended to co-operate so that any work exhibited in the drawings and conditions and not mentioned in the specifications, or vice versa, are to be executed the same as if it were, mentioned in the specifications and set forth in the drawings to the true meaning and intention of the said drawings, conditions and spec­ifications without extra charge whatsoever. IV. The builder shall at his own cost provide all materials and labor, scaffolding, implements, moulds, models and cartage of every description which may be necessary for the proper execution of work included in this contract, according to the true intent and meaning of the drawings and specifications, whether the same may or may not be particularly described therein, and in case of any discrepancy between the drawings and specifications the said engineer Is to decide which shall be followed. V. The owner may at any time during the progress of the said building, make any alterations, deviations, additions, or omissions -2-