Skip to main content

Search the Special Collections and Archives Portal

upr000220 72

Image

File
Download upr000220-072.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000220-072
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Los Angeles, March 14, 1951 % 300-4 VL A. E. Stoddards (cc - Mr, W. C. Perkins) Referring to LVL&WCo. 1951 Budget Item No. 1 and LA&SL Budget Item No. 2t At the time we prepared the proposed pipe line layout to serve the West Side District, the City of Las Vegas proposed to purchase vacant land north of Old Town, adjoining the north­erly city limits, incorporate this area Into the City and con­struct thereon the Las Vegas Housing Administration Project, and the location of our proposed transmission main was planned accordingly. City now advises that It will not acquire the above mentioned area, but in lieu thereof purchased on Feb. 22nd property already within the city limits, located north of Bonanza Road between "H" Street and Sunny Place, and has funds provided for the immediate construction of the first unit consisting of Administr­ation Office, Community Building and 100 duplex housing units and residences, and proposes to start construction as soon as possible. We do not have water mains in this area, and in view of City's change in its plans, we have prepared the attached revised plans and estimates fox LVL&W Item No. 1 and LA&SL Item No. 2. The originals of these estimates are attached to Mr. Perkins1 copy of this letter. The transmission mains will enable us to serve the en­larged West Side District and furnish additional water and pressure to Old Town. As this area is developed, the service lines connect­ing with these mains will be constructed under Rule 9-A of the Nevada Public Service Commission. The revised estimates as compared with original estimates are, as follows: Inv. LA&SLRRCo. Item No.2 $40,340 LVL&WCo. Item No.l_ Total 18,360 V m Original 4* Estimate Revised Total Inv. *jgr“ Total $40,340 $36,830 $220 $37,050 18,360 32,410 “TS?o 32,410 f W T W 169,240 $69,460 We will appreciate early approval of these revised Budget Items so we can obtain materials and start construction as soon as possible. Wm. Reinhardt