Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
J. M. MONTGOMERY & CO., INC, Engineers Los Angeles 35, Calif0 LOS ANGELES AND SALT LAKE RAILROAD CO. Valuation of Collection and Transmission Facilities (as of Dec. 31, 1950) ITEM Quantity Aver. Estimated Reproduction Cost Depreciation Age (Years) Total Life (Years) Per Unit Installed Overhead Amount Total Per Unit Total Amount Annual Accrued Present Value RESERVOIR NO, 1 * 2.5 M G Reservoir -(Clark St.) 21.5 50 115,684.00 5 5,784.20 121,468.20 121,468. 2,429.36 52,231. 69,237. Booster Pump Station: Structure 6.5 AO 5,442.00 5 272.10 5,714.10 5,714. 142.85 928, 4,786*. Pumps, etc. 6.5 30 11,650.00 5 582.50 12,232.50 12,232. %407.75 2,650. 9,582. Pipe, Valves, etc. 6.5 50 21,763.00 5 1,088.15 22,851.00 22.851. 457.02 ...iilTlt 19.880, $ 162,265. $ 58,780. $ 103,485. RJJS1JRV0£R NO, 3 1,2 M G Reservoir (Charleston Blvd.) 3.5 60 74,060.00 5 3,703.00 77,763.00 77,763. 1,296.05 4,536. 73,227. Drain Ditch lin. ft. 2,780 3.5 50 0.20 - 0,20 556. 11.12 39. 517. Fire Protection 3.5 40 3,769.00 5 188.45 3,957.45 3,957. 98.94 346. 3,611. Booster Pump Station: Structure 3.5 60 9,694.00 5 484.70 10,178.70 10,179. 169.64 594. 9,585. Pumps, etc. 3.5 30 16,972.00 5 848.60 17,820.60 17,821. 594.02 2,079. 15,742 Piping, Valves, etc0 3.5 50 13,437.00 5 671.85 14,108.35 14.109. 282.18 988. $ 124,385. $ 8,582. $ 115,803. SETTLING BASINS No. 1 25.5 50 7,199.00 5 359.95 7,558.95 7,559. 151.18, 3,855* 3,704.' No. 2 6.5 50 8,420.00 5 421.00 8,841.00 8 , 8 a . 176.82 1,149. 7,692. No. 3 3.5 50 7,195.00 5 359.75 7,554.75 7.555. 151.09 .. ....2,026, $ 23,9550 $ 5,533. * 18,422. BONANZA VILLAGE BOOSTER STATION Structure 1 .T 60 3,680.00 5 184.00 3,864.00 3,864. 64.40 97. 3,767. Pumps and Controls 1.5 30 8,530.00 5 426.50 8,956.50 8,957. 298.55 448. 8,509* Pipe and Fittings 1.5 50 5,209.00 5 260.45 5,469.45 - 5.469. 109.39 164, $ 18,290. $ 709. $ 17,581. - 6 -