Skip to main content

Search the Special Collections and Archives Portal

upr000172 114

Image

File
Download upr000172-114.tif (image/tiff; 26.88 MB)

Information

Digital ID

upr000172-114
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Mr. L. A. White: Las Vega# - November 5 , 1948 W 5-4-2 ( oe — Mr. B. F. Wengert) t o 1? £oc»rd^ o e with your rile BB 19-I-0, I show below statu el eotft eurn cOocmtpolbeetre d2 0, work Orders: ot a waIer main9 in Charleston Square t!4oo ’p™ro*ce^ed Man1 ld/ loduerr S,l e**g*a*l* dneowp a8rtlSmennit^ ei<sa dtrbaewiirn gi nutpention necessary contracts. However, it is doubtful if we can complete this by the end of the year because of anticipated delay in receiving pipe. * . *0-553, water mala extension in Slock 1 . fr&ct #4, B.B.H.A., for B. A. Saltzman: Subdivider nas suffered some financial reverses and is unable to proceed at this time. This Work Order has been held open since January 1946 and as there is no definite prospect for commencement of work, I have recommended cancellation of authority. Hao race S«hwi.d?l?e"r5:6 8*CrtoWnittrearc t81 0h11a1s lbne eMna ydfraaiwrn Balnodc k is# 4i nfor the hands of subdivider for execution. I feel sure we can complete this Work Order physically and finan­cially by December 3 1st. WO- 596, well on Las Vegas Ranch: I am ad­vised contract with well driller has been signed and rig will arrive here November lo. Believe this one can also be completed by Dec ember 31st* WO-608, water mains in Creatwood Homes: In­stallation of mains in first half of tract has been completed, but subdivider estimates it will be 6 months before balance of water mains provided for in Work Order covaenr *b e completed. Recommend this be included ln carr#y­A. M. Folger