Skip to main content

Search the Special Collections and Archives Portal

upr000068 60

Image

File
Download upr000068-060.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000068-060
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    V 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 square m Exhibit mk* near point 1. gesMoit IT. In the event the 'District shall mt haw commenced i# construct the new pipe line® and haw nMni the said existing pip# line# and pumping station as provided in Section %$ hereof within two year# from the sale date and shall not have m- pleted said work within two (t) years and ten (w) months *ufe##- ?iu®nt to the sale date * Bailread Oemp&niec * after having given the District sixty (io) days* notice in writing of its intention so to do, shall have the right (a) to construct an adequate pipe line of & capacity e«Iiial to or exceeding that of the existing gb-incfe cast iron pipe line and X6~ineh transits and east iron pip® line shown on said Exhibit *An by broken black and red lines and *f a type and alee to be mutually agreed upon) and in the event the parties cannot agree upon the character of said proposed pipe line within ninety' {90) days after written notice, the same shall be constructed by Railroad Companies of If-inch concrete or pipe of & similar character* Isald proposed pipe line shall be constructed in the location shown In broken red and white Uat between points marked A and ? and ? and I on said Exhibit V. (b) ft construct a Sfc-inah pipe in the location shown in broken red and whit# line 'between points marked K md S on Exhibit *AW and an $»in#h pip# line in location show in broken red and. whit® lines between points marked ¥ and 8 on .Exhibit nA", it being understood that imiBay th# 111