Information
Digital ID
upr000335-093
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Los Angeles, Cal*, l/24/*19 HR. BRIBE; Attached please find analysis covering charges as shown on form 10-14 to App*n. 1955 las Tegas 16” vit.pipe line Comparison between estimate form 50 and form 10-14 reflect the following: form 30 6880.48 16414.71 T Z m S T H T Labor form 10-14 6590.24 Material 15303*66 Total gifi&S.M It would ^ appear that this oob is all completed and charges all entered covering same, but the above figures indicate that we are under the estimate $1 401.29 and' while I have been unable to locate details from which this estimate was prepared, and from what I can learn In Mr. Berlin*s office, an excess amount was provided to cover any Bach Pay allowances or increases in material prices that might at the time form 30 was prepared have not been received and entered on form 10-14. H.M.B. Enel.