Skip to main content

Search the Special Collections and Archives Portal

man000174 79

Image

File
Download man000174-079.tif (image/tiff; 26.21 MB)

Information

Digital ID

man000174-079
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Exhibit ttJLrt LAS VEGAS LAND AND WATER COMPANY GENERAL CONDITIONS AND SPECIFICATIONS FOR CONSTRUCTION AND INSTALLATION COMPLETE IN PLACE OF THREE TRANSFORMER STATIONS TO SERVE ELECTRIC PUMPS IN WELLS OF LAS VEGAS LAND AND WATER COMPANY AT LAS VEGAS,NEVADA. SECTION NO. 1 - GENERAL CONDITIONS; The General Conditions as hereinafter set forth shall apply to all Specifications used in connection with this work. The word "Company'’ or "Land Company" shall designate the Las Vegas Land and Water Company. The word "Engineer" shall designate either the Acting General Manager or the Engin­eer of the Land Company as its authorized representative, and the word "Contractor", the contracting party to whom work is superintendence, labor, tools, plant equipment, and means of construction for and to construct three transformer stations and power lines to wells at Las Vegas, Nevada, in the most expeditious, substantial, and workmanlike manner to the satis­faction of the Engineer. Contractor shall complete the work covered by these specific-in sufficient time so as not to delay placing in oper­ation pumps on wells now being drilled. Contractor shall examine the existing site and familiarize him­self with local conditions. The Engineer will survey the site and set all nec­essary stakes for location of the stations. COMPANY ENGINEER AND CONTRACTOR DEFINED awarded WORK INCLUDES; The Contractor shall furnish all necessary materials TIME OF COMPLETION: Account urgent need for new pumping facilities, the CONTRACTOR TO EXAMINE SITE: Before submitting his proposal and bid for this work SURVEYING SITE; - 1 -