Information
Digital ID
upr000214-163
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Los Angeles - July 21, Orlg JPM-On Line A LA Cy JMA-Kelso Well No. 8 has apparently sanded In. Where It previously flowed 554 GPM it is now down to 200. Seep well No. 10 dropped off from 131 OPM to 56 flowing, and under pump has dropped from 280 to 202. While we are not short of water today, these two deoreases reduce our reserve and consider It necessary we take steps to protect ourselves. | want to promptly do three things: First - Ball out No. & and see if ve oan restore its production. Second ~ Ball out No. 10, and after It has been cleaned, lower the submersible pump as we have previously arranged. Third • dot production started from Middle Springs, In which ehlorinater and pump Installed but have not been placed In operation. if JMA not available for this work or has no one in hie organisation capable of handling, pleaee advise me If you have cable, bailer and hoist available for this work and I will arrange to have K. B. Hall send some of hie men up from the Oil Field. Prefer this work be done by JMA who is thoroughly familiar with the field, but we cannot delay It any longer. Please advise.