Information
Digital ID
upr000177-401
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Las fegas • March 3, 1950 IWhS Mr. A. 0* Kitten la February 19^8 the Railroad Company entered into an arrangement with death Kev&da Power Company under whleh the later would deliver power for ridlread usage at Lae Vegas whloh would permit abandonment of ota* steam power plant. Inoidental to this agreement the Railroad Company provided the Power Company with easements over the properly held and two sites for oonatruotlon of sub-stations. The 1st *ub-atatlon was constructed in the vlolnlty of the old power plant, but when the Power Co. made application to the Planning Commission to construct the 2nd sub-station near Ranohs Ko&d they met with refusal because it was too close to a main thoroughfare. The Power Company inquires whether the location of the 2nd site can be changed from Ranehe Bead to a point approximately Idoo feet east. Mill you Mindly advise. Letter from the Power Company and print shoving new location is attached. A. K. Folger