Skip to main content

Search the Special Collections and Archives Portal

upr000098 34

Image

File
Download upr000098-034.tif (image/tiff; 26.87 MB)

Information

Digital ID

upr000098-034
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 & 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 The performance of said work, the completion thereof and payment therefor shall he at the times and In the manner provided In this Section 5* All pipe lines to be constructed (except those within the boundaries of the pumping station site described In sub- paragraph (1) of Section 1) shall be at least four feet (41) be­low the surface of the ground. Immediately after the work describee in subparagraphs (a) to (g) of this Section 5 has been completed and the facilities therein described placed in operation, the pipe lines and wirelines described in subparagraphs (h) to (1) of this Section 5 shall be removed from the lands of the First Parties and the surface of said lands restored to substantially the same condition existing prior to the removal thereof. Hot later than thirty (SO) days after the sale date the District shall submit to the First Parties plans and specifi­cations for the above-mentioned work which shall provide for the construction of pipe lines with inside diameters which may be less than but shall not exceed those above set forth. The First Parties shall approve or disapprove said plans and specifications, pro­vided that approval thereof shall not be unreasonably withheld or delayed. Within one hundred eighty (180) days after the sale date or within one hundred eighty (180) days after the First Parties shall have approved the plans and specifications, whichever date may be later, the District shall award a contract or contracts for the performance of said work in accordance with the plans and spec­ifications approved by the First Parties. 2 6