Information
Digital ID
upr000113-178
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Over 30,000 feet of new oast Iron water mains were installed in Lae Vegas In 1942 to take oar of the 600 new houses built for Defense Housing alone. And the potential capacity for water production was practically doubled. The statistics are as follows: Potential Production 1941 - 6,380,000 gallons per day. 1942 - 11,320,000 gallons per day. Humber of Service Connections: 1941 - 2468 1942 - 3069 Sources of Supply; 1941 * 2 springs and 6 wells 1942 - 2 springs and 10 wells, with pumps. Water Mains, in Place: Transmission mains - 26,305 feet. Distribution Mains - 132,667 feet. Extensions to Serve Defease Housing Projects during the Tear: Huntrldege 125 !new homes ___ &87 $ /gT? Blitmore 100 i N H p h 'V Victory 40 r a ‘ itoo Tlffandale 66* i 8 . El Enoanto 64* 1 it | » Mayfair No-1 86 '' « .|“ fo4oo Mayfair Ho-2 69* # 8 Mayfair No-3 72* if 8 v .j m e z i : (* Indicates “Under Construction*). Las Vegas, Dec. SO, 1942