Information
Digital ID
upr000215-184
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Los Angeles • March 18, 1946 WEB - Las Vegas B-44. When a l l other wells are open to oapaolty pipe lin es to present reservoir w ill not oafrry additional load from No. 11. Have today arranged with McNeil to rush a l l possible construction of new settlin g basin, and as soon as transits pipe arrives we w ill cut No. 10- and 11 through settlin g basin into 24" ‘lin e . J-M Co. advises transits pipe is on dock, but shipment withheld pending settlement of dockmen' s strike whloh they hope to accomplish next few days. I hope to get 9, 10 and 11 into 24" lin e before June 1st, and w ill do everything possible to that end. S-89 PS 11 H 1^46