Skip to main content

Search the Special Collections and Archives Portal

upr000286 264

Image

File
Download upr000286-264.tif (image/tiff; 34.01 MB)

Information

Digital ID

upr000286-264
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    DESCRIPTION OF PROPOSED WORKS Water will be diverted from said artesian basin by means of an artesian W O llte d B i i H e d h itifer i^MttillVtteOftiet6Ely6hr&i){M&yorkB.WebHthtiOh fofls, cBfc£tS,e^ne^.ol ifejfar c3>SQb, g S ’att^t . Ox 13 3/8* 48# easing and cemented in at that depth, and cased with 216.61 ft, is to be stored in reservoirs, ltshould be so stated and the location of the reservoir should be given with reference to the legal subdivisions. of 10 3/4 * 45# casing inside said 13 3/8” casing set at 410.0 ft..Total depth of well 472.0 ft. Will install deep well pump if necessary to main-tain flow.- Top of well tu be-connected with settling basin located in -SW|SW^ Sec. 2 9f said Township, by means of 12** transits pipe.— Casing to be equipped tilth, control valve. 5. Estimated cost of works___________ $7500,00._______________________________ 6. Estimated time required to construct works Qno year._____________ This application is made for purpose of acquiring rights to the 7. Remarks— use of the water existing in said subterranean channel or basin For use of applicant and not merely rights tn water flowing.from said well.__Tha &iattributing system consisting of settling basin,— 2,500,000 gallon cprinrate reservoir, .pipe lines from reservoir to City of Las Vegas and other pipe lines and laterals, are described in the Proof of Appropriation filed under Permit 7201 X A 3_:g E Q A S T.ANP A B B FATAH Compared. COM PANY , Applicant. B y ________ Its Tice President and Agent. This sheet inspected. , Engineer. APPROVAL OF STATE ENGINEER. This is to certify that I have examined the foregoing applica­tion, and do hereby grant the same, subject to the following limi­tations and conditions? This permit is issued subject to all prior rights on the source* A valve must be installed and maintained to prevent waste of water and accurate measurements of water placed to beneficial use must be taken from time to time. This source is located within an area that has been designated by the State Engineer as coming within the meaning of the provisions of the 1939 Underground water Act, as amended in 1943; therefore, the State reserve* the right to regulate the use of the water herein granted at any and all times. The amount of water to be appropriated shall be limited to the amount which can be applied to beneficial use, and not to exceed Three (3»0) cubic feet per second. Actual construction work shall begin on or before September 29, 1943 Proof of commencement of work shall be filed before October 29, 1943 Work must be prosecuted with reasonable diligence and be completed on or before September 29, 1945 Proof of completion of work shall be filed before October 29, 1945 Application of water to beneficial use shall be made on or before September 29, 1947, Proof of the application of water to beneficial use must be filed with State Engineer on or before October 29, 1947. WITNESS MT HAND AND SEAL this Map Filed 00T 5 1942 29th day of March, 1943, ALFRED MERRIT SMITH State Engineer. State Engineer.