Information
Digital ID
upr000189-039
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Las Vegas - July 20, 1953 W 23-1-95-1 Mr. R. L. Adamson - Los Angeles ccs Via. Reinhardt Attached please find report entitled ”Final Inspection of Welded Elevated Tank* marked “Received In Torrance Office June 29, 1953* which was handed me by Mr. C. L. Macom and which was filled in by him and signed by him as C.B & I Foreman. I think the contract number indicated on the top of the form refers to the Charleston Blvd. tank. I presume you will wish to have the person who acted as Inspector for the Railroad Co. sign as “Inspector for Customer” at bottom of report. Mr. Macom says some times their inspector signs here but in this case their inspector had to leave before tank was complete. When form Is complete, Mr* Macom requests that you mail It to Chicago Bridge and Iron Co., P.0, Box 238, Torrance, California. L. R. M&ag Enel. LRM/tp