Skip to main content

Search the Special Collections and Archives Portal

upr000113 209

Image

File
Download upr000113-209.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000113-209
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Hr. Toland #4 January 30, 1941 ( V # In addition t<K replacement of old water lines with new east iron, the following improvements in the water system were also made during 1940: Important changes during the year: March 8, 1940, Well Mo. 3 was drilled" to a depth of 8G0\. A perforated liner was installed and the casing was cemented at the top so Its production could ' shut off when not actually required. The production is 939,600 gallons per day and the production wae available from April 30th, when transmission main was completed, until December 28th, whesNnell was shut In. May 4th, Weil So. 4 was/drilled to a depth of @00*, the interior arrangement being the same as for Well Mo* 3, so its sopplj\could he conserved when not actually required. Its production is 650,960 gallons per day, and Its supply was available from June 22nd, when transmission main was complete^, until October 4th, when well was shut in. Jr' Well 8o, 2, driilsd in 1936, was also reconditioned during 1940, a perforated liner being Installed and the easing cemented at the top so its production\could be conserved. This well was also shut in October 4th\after the heavy demand In the Gity had lessened. X \ Segregation of Charges to *M0H*: Water Mains Rooming House __ SeST Gal. Packing Houses total. On Hand tlfrWWc. f Z l S Z . j Z there is alec attached, for your information, a statement indicating production from all sources at Las Vegas, the amount used by the Water Company, the amount sold and utilized by the Railroad Company, and the surplus permitted to run down las Vegas Creek for irrigation purposes at the Ranch, if we can furnish any additional information to assist you in preparation of this report, please let us know and we will be glad to forward same promptly. Tours very truly, mtfm T K n m rw rm m m Vice President