Information
Digital ID
upr000156-166
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.84. Year Total Estimated Annual Cost Cost Per MG- 1950 $316,100 $ 81.50^ 1958 452,100 ,77.10 | 1960 689,500 110.00 1970 880,300 9i.io / 1980 892,900 81.50 J The total annual costs given above were computed on the following bases: (1) Annual payments on first cost both for construction and for acquiring water properties. Bonds bearing 5% interest, retiring serially over a 30-year period. This results in an annual payment of 5.102$ of the first cost. (2) Maintenance Pipe Lines - Inspection - $1,000 per year Repairs - 0.1$ of first cost per year Electrical Controls - 5$ of first cost per year Pumps - 3$ of first cost per year Structures - 1$ of first cost per year Reservoirs - 0.5$ of first cost per year Distribution System (of Water Co.) - For 1950 same as given in 1948 Annual Report ($18,600; increasing to $37,200 by the year 1990. (3) Operation. Assuming remote control of booster stations, partial attendance at well field, and full time attendance at installation at Oakey and Sixth, the following labor is necessary: Well Field . . . 2 ^ $2,400 $ 4,800 per yr. Lake Mead System 5 fL $2,400 12,000 per yr. Technical Superintendance 6.000 per yr. Total Labor . . $22,800