Skip to main content

Search the Special Collections and Archives Portal

upr000280 121

Image

File
Download upr000280-121.tif (image/tiff; 88.47 MB)

Information

Digital ID

upr000280-121
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

LOS ANGELES & SALT LAKE RAILROAD COMPANY UNION PACIFIC RAILROAD COMPANY, Lessee Improvement made to Water Production Facilities of LA&SL RR Co. at Las Vegas, Nevada, from January 1, 1931 to December 31, 1951 Exhibit No. Page No._ witness Date Project w.o. Date Work Physically No. Started Completed SB ” T2)- 684 8-24-36 3-31-37 1402 8- 1-39 11-28-39 Description of I/ells and Appurtenant Facilities Referred to in Affidavits of Completion Filed with State Engineer — ' ~“u r Drilling artesian Well No. 2 at point of diversion to a depth of 802 feet, and in stalling therein 734 feet of 12 inch No. 8 gauge hard red steel casing, with 12 inch flanged gate valve. Installing 1254.2 feat of 12 inch transite pipe, connecting well with settling basin located in Sifit of SW^ Sec. 29, T.2C S., Range 61 £., M.D.B.& M., mentioned in proofs filed in connection with application and permit No. 7201, and were made at well and between said well and settling basin. None State En­gineers Permit No. Sum stated in Affida­vit to be "At Least" the Amount Expended on Wells & Appurten­ant Facilities ~ ~ (6) Actual Cost of V/ell and Appur­tenant Facili­ties Described in Column (4) ---- TtT 10127 7 185.00 9 667.52 Description of Improvement Other Than Wells Atid ADDurtenant Facilities [j (8) ~ Constructed 1103 ft. of new pipe line, replaced 3,646 ft. of existing pipe line and con­structed fence around w ell. Replaced 6,038 ft.of pipe line between reservoir and city con­nection and constructed 1,529 ft. of new pipe line. Cost of Facilities Shown in Column (8) (9) Total Cost TW ~ 10 300.37 19 967*89 8 509.54 8 509o54 1537 2-23-40 12-31-41 Drilling Well No. 3 at point of diversion to a depth of 800 feet and casing inside with 82 feet of 16 «', 525 feet of 10 3/4" and 3 11 feet of 8 5/8" casing; also 894.6 feet of 12 " transite cast iron pipe con­necting top of well with settling basin; also concrete weir box; also control valves on casing and were made at the point of diversion. 10458 Drilling Well No. 4 and installing 40 feet of 16" stave pipe casing cemented in at 46.6 feet; 506 feet of 10 3/4" casing, cemented in at 511 feet; 315 feet of 7" casing landed at 806 feet. Also 446.0 feet of 10" and 819.0 feet of 12" C.I. pipe line from well to connection with existing line which leads to settling basin, and were made at point of diver­sion. (Note: The 4 4 6 ’ of 10" C.I. pipe and i 10508 819* of 12" C.I. pipe retired under W.0. 2029) 1815 1-19-41 5-29-42 Drilling Well No. 5 at point of diversion to a depth of 489 feet and casing with 280» of 13 3/8" steel screw oil well casing, and 2 3 1’ of 10 3/4" steel screw oil well casing; cementing in top casing; also 174 feet 12 " transite pipe, 98 feet 10" cast iron and 8* of 10" wrought iron transite pipe from top of v/ell to pipe connecting with settling basin, and were •made at the point of diversion. Drilling Well No. 6 at point of diversion to a depth of 500 feet and casing with 290* of 13 3/ 8" steel screw oil well casing; and 241* of 10 3/4" steel screw casing; ce­menting in top casing; also 342 feet of 10" cast iron and 6r|- feet wrought iron transits pipe from top of v/ell to pipe connecting with settling basin, and were made at the point of diversion 10707 13 745.92 14 109.09 10 924.00 11 247.60 10706 4 869.74 8 052.41 Constructed 856 ft. of new pipe lines, wooden derrick at Well No. 4, concrete mats at Wells 3 and 4, spring house at Middle Spring, installed pumping equip­ment at Middle Spring, and con­structed power line. 4 993.08 30 349.77 7 630.26 8 791.00 Replaced 954 ft. of existing pipe line. Installed pumps in Wells Nos. 5 and 6, constructed mats and derricks at wells, power line and installed telemeter cir­cuit. 15 859.56 32 702.97