Skip to main content

Search the Special Collections and Archives Portal

upr000221 99

Image

File
Download upr000221-099.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000221-099
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Water Well. #4 H istory UN IO N P A C IF IC RAILROAD COMPANY L a s V e g a s , N e v a d a Location: North. 500* West o f the East Quarter corner Section JL, 20-61, M. i f B. & ®. Spudded 4/25/40 4/26/40 4/27/40 4/28/40 4/29/40 4/30/40 II 1/40) 5/ 2/40 ) 11 3/40 5/ 4/40 5/ 5/40 at 3:00 P. M., A p ril 25, 1940 Spudded at 3:00 P. M .; d r ille d 34* o f 15-1/8" hole Reamed 15-1/8” hole from 0 to 34’ &ud d r ille d 20” hole to 46. 6’ ; at 7:30 A. M. ran 40’ -16" -3/16” w a ll, e le c tr ic weld, Western Pipe and S teel Co. casing, co lla rs each end, hang at 39’ and cemented ' w ith 39 sacks cement; 16” landed 39’ below c e lla r flo o r or 46. 6’ below ta b le; made up c e lla r connections; found cement at 41’ 5" from bottom. 10:00 A. M. d r ille d out cement; d r ille d 15-1/8” hole from 46 to 206’ D rille d 15-1/8” hole to 468’ D rille d 15-1/8” hole to 512’ ; sta rtin g running casing at 10:00 A. M .; ran 511*9’ -10-3/4" casing, landing and cementing same 506. 4’ and cemented with 290 sacks V ic to r Modified o i l w ell cement; cementing completed 3: 30 P. M. 511*9’ casing was 10-3/4" -40*5# Lapweld, Grade H-40, Range 1, T & C, Baker W hirler Float shoe on bottom. Squeezed 150 sacks V ic to r Modified O il W ell cement between the 16" and 10-3/4” Standing cemented 8:00 A. M. landed casing, made up c e lla r connections, made pressure te s t on casing, proved okeh; d r ille d out casing shoe; found cement at 503’ ; d r ille d 9- 3/4" hole from 503 to 576’ D rille d 9-3/4" from 576 to 306’ Ran 315’ -7" lin e r including 300’ perforated on bottom and landed same at 806’ ; top o f Baash-Ross s teel adapter on top o f lin e r at 491’ > washed, w ell from bottom; displaced mud; w ell started to flow at 11:00 P. M.