Information
Digital ID
upr000204-063
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Salt Lake, December 28, 1953 9215-3-J / Mr. V. v* smith - Los Angelas (CO - Ip* E. E. Bennett JKr. um. Reinhardt Los Angeles Los Angeles) Referring to Work Order 5294 covering the proposed construction of new water tank at Las Vegas. Presume you are proceeding with excavation and the erection of forms for foundation. Mr. Perkins has advised that anchor bolts were shipped from Kansas City December 11. and reinforcing steel was delivered to Los Angeles freight house for shipment to Las Vegas,December 23. You should follow through on these shipments to Las Vegas and see that foundation Is progressed to completion promptly so that the Darby Corporation »who have contract to erect the tank *will not be delayed as they are planning on starting the erection work February 1, 1954. same April 15, 1954. and completing